Water Main ExtensionHaring Township, Michigan

Map View

 

Gosling provided the design, permitting and construction engineering services for a water main extension to Baker College for the Charter Township of Haring. Started in August, the project needed to be completed by the end of September to allow for the college to open dorms for the upcoming school year. The project included approximately 2,900 linear feet of 12” watermain and a master meter installation. The project was competed on a fast track with topographic survey, plan and profile drawings, permits and construction completed in less than 60 days.