New Wells and Water MainKalkaska, Michigan
Map ViewRelated Services
Related Project Types
Within the last several years, Gosling Czubak has designed two new high capacity wells (900 gpm each) for the Village of Kalkaska. Location of these wells involved extensive aquifer testing to assure isolation from contaminated groundwater in the vicinity. The work also included installation of pressure reducing pump control valves, design of the wellhouse, modifications to the control system and design of chemical feed systems. Other recent work for Kalkaska includes design of several miles of water main extensions and replacements.
What our Clients Say
Related News
August 16, 2021
Eric Vincke Certified as Drinking Water Operator
July 19, 2021
New Biosolids Sampling Requirements