1.3 MGD Wastewater Treatment Plant

This new $9M wastewater treatment plant was completed by a design/build process within 18 months, from groundbreaking to substantial completion. Flow capacity at the plant is 1.33 million gallons per day.

Wastewater Treatment Plant

Gosling Czubak completed design of a new 582,000 gallon per day extended aeration mechanical plant/lagoon hybrid process wastewater treatment plant for the Village of Elk Rapids in Antrim County.

McKeese Road

Gosling Czubak provided design and construction engineering services for this BIA funded road improvement project.

Wastewater Treatment Plant Addition

The project consists of the construction of a new 50,000 gallon concrete surge tank, housed in a two- story building addition. The surge tank is designed to assist the existing WWTP with flows coming from a new hotel and restaurant development.

New Wastewater Treatment Plant

Gosling Czubak designed a unique, 135,000 gallon per day oxidation ditch - activated sludge process wastewater treatment plant for Haring Township in Wexford County. 

Sewage Forcemain Directional Bore

Gosling Czubak designed $5.3M in pumping station improvements and about four miles of sewage force main for Bear Creek Township and the Harbor Springs Area Sewage Disposal Authority. 

Wastewater Treatment System Improvements

Gosling Czubak provided the planning, assisted with the SRF funding acquisition, designed, permitted and provided construction engineering on this $8.0M expansion and improvement to the wastewater treatment and discharge system serving the western portion of Houghton Lake.

Copper Ridge Mixed-Use Development

Copper Ridge is a 73-acre mixed-use development on a very hilly site overlooking Traverse City in Garfield Township, Grand Traverse County. 

New Auto Service Center and Show Room

Gosling Czubak designed parking layout, site grading, water and sewer services, and stormwater management for a new automotive full service center and Audi/VW auto show room for Serra Automotive in Traverse City.  

Ridge45 Apartments

Gosling Czubak completed construction staking for a residential apartment complex on the south side of Traverse City. Work included staking of underground infrastructure, sidewalk, curb and gutter, five apartment buildings and a pool/office building. 

Woodstone Development

Gosling Czubak has provided the surveying and engineering services necessary to develop this 80-acre single-family residential condominium community.

M-O-A Landfill

Gosling Czubak completes topographic surveying to determine quarterly volumes at a regional solid waste disposal facility in northeast Michigan.

Sewer Collection System

Gosling Czubak provided engineering services from inception to the completion of Blair Township’s sewer system.

Water and Sewer Improvements

The Village of Kalkaska completed water and sewer improvements throughout the Village.

Wastewater Lagoon Facility

Gosling Czubak completed the reconstruction design of an existing 97.8 Million gallon (MG) per year wastewater lagoon facility in Markey Township.

Schirmer Parkway Lift Station Upgrade

Gosling Czubak teamed with FHC to upgrade a pump station to serve the eastern portion of the City of Buchanan, including southeastern Barrier County. 

New Sequencing Batch Reactor

Gosling Czubak completed design of a new 30,000 GPD sequencing batch reactor plant with tertiary filtration and a finescreen, which discharged to rapid infiltration basins. 

Interlochen State Park Wastewater Feasibility Study and Improvements

Gosling Czubak was selected and completed the preliminary engineering study for the viability of the old wastewater facility at Interlochen State Park.