Skip to Main Content

Projects

Our Projects

Merit Energy Company

When Merit Energy Company of Dallas, Texas was looking for a consulting firm to guide them through the myriad of State of Michigan regulations and implement Merit Energy’s environmentally responsible business plan, they selected Gosling Czubak.

Wastewater Treatment Plant

Gosling Czubak completed design of a new 582,000 gallon per day extended aeration mechanical plant/lagoon hybrid process wastewater treatment plant for the Village of Elk Rapids in Antrim County.

Water System Improvements

Gosling Czubak provided design and permitting services for a new 450 GPM water supply well, a 500,000 gallon ground storage reservoir and 11,000 feet of 16" water main to connect the new reservoir to the water system in the Township.

New Wells and Water Main

Within the last several years, Gosling Czubak has designed two new high capacity wells (900 gpm each) for the Village of Kalkaska. 

Four Corners Remediation System

Gasoline and fuel releases were confirmed at four different gas stations at Front and Division Streets in Traverse City. Gosling Czubak designed a remediation system to clean the site. 

Environmental Consulting

Gosling Czubak provided permitting and compliance services to various mining operations throughout the State of Michigan.

Wellhead Protection Plan

Gosling Czubak has completed numerous wellhead protection plans for communities throughout Northern Lower Michigan.

Groundwater Modeling

Gosling Czubak conducted a remedial investigation at a crude oil central production facility. Soil and groundwater were investigated to identify and characterize potential sources of contamination. 

Clare's Country Corner

Soil and groundwater were contaminated with hydrocarbons from historic releases from underground storage tanks. Gosling Czubak completed site characterization work including soil and groundwater sampling.  

Air Stripping Remediation System

Petroleum releases from an oil and gas central production facility in Otsego County, MI impacted soil and groundwater at the site. 

Mini Mart LUST Investigation/ Remediation

The UST excavation was dewatered as part of removal and new tank installation activities. Contaminated groundwater was treated with a two-stage granular activated carbon system with the treated water discharged, under an NPDES permit, to the Elk River.

Marion Mini Mart LUST

During site upgrades an abandoned leaking underground storage tank was discovered.  Gosling Czubak conducted an initial and final assessment to determine the extent of soil and groundwater contamination.

Agribusiness Food Processor

Gosling Czubak conducted a comprehensive hydrogeologic and remedial investigation for a fruit processing facility. 

SWPPP Plan

Gosling Czubak completed a Storm Water Pollution Protection Plan (SWPPP) for an oil and gas exploration and production company.

New Sequencing Batch Reactor

Gosling Czubak completed design of a new 30,000 GPD sequencing batch reactor plant with tertiary filtration and a finescreen, which discharged to rapid infiltration basins. 

Interlochen State Park Wastewater Feasibility Study and Improvements

Gosling Czubak was selected and completed the preliminary engineering study for the viability of the old wastewater facility at Interlochen State Park.

1957
Our Year of Foundation
+40
Employees
6
Main Services
67
Years of Experience